Monday, February 26, 2007

milestone 2


Well, i'm still slightly behind. While i have a lot of coding done, i do not have access to my SATO account, which is really pulling me back because i can't test anything i have on there. I have all the coding and tables drawn up, so once i have the sato account it will be a small ammount of effort before i will be able to start testing.

Today during class i plan to use 3 different color pieces of paper, i'll ask everyone to write down their prefered time, place, and flash mob on each different color. This i'll use as the random information on the site, people will be able to add in their own, but there needs to be something there to start with. And this way i get a variety of times and places that a college student would have.

I was able to get pictures from Matt (also for my independent study) about the Flash Mobs, what they did, and information on the events.

Hopefully this meeting will go better then the last.

Monday, February 05, 2007

Gantt Chart and new web link



http://www.umit.maine.edu/~meghan_lucasmaguire/Capstone3/index.html

This is the new weblink for the HTML version of the website.. it's no longer just in Image Ready.

The Gantt Chart is up to date, though i'm slightly behind in where i'd like to be.

I'm having difficulties with figuring out the coding, and finding someone to help if i can't do it.